- 1(a)2 marksState the difference between the natural and the built environment.
- 1(b)(i)4 marksName EACH of the elements of the building labelled A-D.
- 1(c)6 marksThe working drawing for the building in Figure 1 specifies that a strip foundation 450 mm wide be constructed at the depth of 750 mm. Produce a neat, labelled and dimensioned sectional sketch of a typical strip…
- 1(ii)6 marksExplain TWO functional requirements for EACH of the building elements identified as A, B and D on the floor plan.
- 2(a)(i)2 marksState TWO factors to consider when choosing the site.
- 2(a)(ii)2 marksName TWO temporary services needed to enable site work.
- 2(a)(iii)2 marksState TWO reasons for hoarding the building site.
- 2(b)(i)3 marksBuilder's square
- 2(b)(ii)3 marksTape measure using the 3:4:5 method
- 2(c)6 marksProduce a labelled pictorial sketch to illustrate a typical corner profile board showing the trench lines and wall lines.
- 3(a)2 marksState the difference between hardwoods and softwoods.
- 3(b)4 marksName FOUR of the labelled parts A-F.
- 3(c)(i)2 marksSuggest TWO disadvantages of the quarter sawing method of conversion for producing lumber for the construction industry.
- 3(c)(ii)1 markFor the benefit of the lumber yard dealer, suggest ONE other method of timber conversion that is suitable for producing lumber for the construction industry.
- 3(c)(iii)3 marksJustify why the method of conversion stated in (c)(ii) is more suitable for producing lumber for the construction industry by listing TWO advantages and ONE disadvantage of that method.
- 3(d)(i)3 marksTo avoid wastage of material, outline THREE steps that should be taken to store structural timber on a building site.
- 3(d)(ii)3 marksCalculate the moisture content for a sample of wood which weighed 24.5 grams when wet and 18.6 grams when dried. (State the formula and show all working.)
- 4(a)(i)3 marksPlywood
- 4(a)(ii)3 marksPlastic
- 4(b)(i)2 marksGable
- 4(b)(ii)2 marksHip
- 4(b)(iii)2 marksHip and valley
- 4(c)(i)2 marksDetermine by calculation the total number of risers required.
- 4(c)(ii)3 marksDetermine by calculation the total going for the staircase.
- 4(c)(iii)1 markDetermine whether or not the dimensions for the stairs meet the requirement for safety and comfort.
- 5(a)(i)3 marksName EACH of the tools labelled A, B and C in Figure 4.
- 5(a)(ii)3 marksState ONE use for EACH tool identified in (a)(i).
- 5(b)2 marksGive the names of TWO power tools that are used to obtain the hole required to fit a face basin in a bathroom cupboard.
- 5(c)(i)1 markCutting irregular patterns on wood
- 5(c)(ii)1 markProducing a 45° edge on a piece of stock
- 5(c)(iii)1 markProducing the mortice in a table leg
- 5(c)(iv)1 markConverting a piece of square stock into a cylindrical shape
- 5(d)6 marksOutline THREE sequential steps of procedure to cut the tenon for the rails.