CSEC Industrial Technology · 2018 · Paper 2
28 questions and parts from this paper. Open one to see it in full, then practise it on Quelpr and get it marked against the mark scheme.
- 1(a)6 marksUse suitably labelled freehand sketches to differentiate among ANY THREE of the following timber defects: (i) Bowing (ii) Live knot (iii) Split (iv) Cup shake (v) Twists
- 1(b)(i)6 marksOutline THREE sequential steps to be followed to spray the wooden chair with varnish.
- 1(b)(ii)4 marksSuggest FOUR benefits to be derived from using stain as a finishing material on the wooden chair in Figure 1 on page 6, prior to applying varnish.
- 1(b)(iii)2 marksIf the wooden chair in Figure 1 is to receive an oil-based paint finish, describe how the following can be used as surface preparation materials: - Wood filler - Shellac/knotting compound
- 2(a)6 marksOn page 9 produce, using a neat single line diagram, a roof framing plan of the hipped end of the roof in Figure 2 to show any FOUR of the following roof members: (i) Hip rafter (ii) Ridge board (iii) Crown/principal…
- 2(b)(i)2 marksState the purpose of the ridge board in the design of the roof in Figure 2 on page 8.
- 2(b)(ii)4 marksName FOUR types of roof coverings that are suitable for the roof in Figure 2.
- 2(b)(iii)3 marksUse a suitably labelled sketch to show how a common rafter should be fixed to the wall plate.
- 2(c)3 marksIf the total rise of the roof in Figure 2 is 1.5 m, calculate the actual length of the common rafter. (Note: You are required to list the formula and show your working. The overhang should not be included.)
- 3(a)(i)2 marksDefine the term 'concrete'.
- 3(a)(ii)2 marksList TWO manual tools that are used to prepare a batch of concrete.
- 3(a)(iii)2 marksName TWO types of tests that are carried out on a concrete mix.
- 3(b)(i)2 marksDescribe specific conditions that require the use of a Raft foundation.
- 3(b)(ii)2 marksDescribe specific conditions that require the use of a Pad foundation.
- 3(b)(iii)2 marksDescribe specific conditions that require the use of a Short-bored pile foundation.
- 3(c)(i)2 marksBriefly outline TWO practical benefits of using a stepped strip foundation as an alternative to the strip foundation shown on the plot of land in Figure 3.
- 3(c)(ii)4 marksUse a suitably labelled sectional sketch to show how a stepped strip foundation would be designed to produce the benefits outlined in (c)(i).
- 4(a)(i)2 marksSuggest TWO uses for a Dovetail joint in furniture construction.
- 4(a)(ii)2 marksSuggest TWO uses for a Housing joint in furniture construction.
- 4(a)(iii)2 marksSuggest TWO uses for a Rebated joint in furniture construction.
- 4(b)(i)3 marksUse a neat labelled sketch to show a suitable method to join pieces of timber to achieve the width of the tabletop.
- 4(b)(ii)3 marksSuggest THREE ways to secure the tabletop to the frame.
- 4(b)(iii)6 marksOutline THREE sequential steps to be followed to chop/dig out the mortise to fit the tenon joint in the table leg shown in Figure 4 on page 14.
- 5(a)(i)3 marksState THREE factors to be considered when choosing a building site.
- 5(a)(ii)3 marksName THREE operations that should be carried out when clearing a building site.
- 5(b)(i)4 marksUse labelled single line boxes to show the location of EACH of the following facilities on the site layout plan in Figure 5: - Storage area for cement, aggregates - General material storage - Security post/site office -…
- 5(b)(ii)2 marksOutline, briefly TWO benefits of hoarding on a building site.
- 5(c)6 marksUse a neat freehand sketch to reproduce the site layout plan given in Figure 5 on page 17. Include any FOUR of the following site plan symbols: - Direction of North - Property lines - Location of the building/front…