  1. 2(a)(i)Draw a network diagram to represent the tasks outlined in the table.[10 marks]
  2. 2(a)(ii)Determine the length of EACH path.[2 marks]
  3. 2(a)(iii)Determine the critical path.[1 mark]
  4. 2(a)(iv)State the expected length of the project.[1 mark]
  5. 2(a)(v)Calculate the amount of slack time for EACH path.[2 marks]
  6. 2(b)(ii)Outline TWO advantages and TWO disadvantages of a flow production system.[8 marks]