Job and Batch Costing · CAPE Accounting Unit 2
22 past-paper questions on Job and Batch Costing, part of Module 2: Costing Systems, from every CAPE Accounting Unit 2 paper on Quelpr.
- 2(b)(i)3 marks· CAPE Accounting Unit 2 · 2002 · Paper 2Calculate the total overhead cost allocated to Job ABQ31.
- 2(b)(ii)6 marks· CAPE Accounting Unit 2 · 2002 · Paper 2Prepare the job cost sheet for Job ABQ31.
- 2(b)(iii)1 mark· CAPE Accounting Unit 2 · 2002 · Paper 2Job ABQ31 consisted of 400 units. What is the cost per unit?
- 2(d)4 marks· CAPE Accounting Unit 2 · 2002 · Paper 2Calculate the under or over allocated manufacturing overhead for the finishing department using the predetermined rate calculated in (a) and the information above.
- 2(b)11 marks· CAPE Accounting Unit 2 · 2004 · Paper 2What was the total cost of the stay of patient Fred Adams in the hospital?
- 2(a)(i)4 marks· CAPE Accounting Unit 2 · 2008 · Paper 2Calculate the firm's pre-determined overhead application rate.
- 2(a)(ii)7 marks· CAPE Accounting Unit 2 · 2008 · Paper 2Prepare a job cost sheet for the Eldon Company job completed in March, showing clearly the traceable and non-traceable costs for the job.
- 2(a)(iii)5 marks· CAPE Accounting Unit 2 · 2008 · Paper 2Calculate the amount of over- or under-applied overhead (non-traceable) costs for Williams and Associates for 2007.
- 2(a)(i)2 marks· CAPE Accounting Unit 2 · 2010 · Paper 2Calculate the total shop overhead applied to jobs in August.
- 2(a)(ii)3 marks· CAPE Accounting Unit 2 · 2010 · Paper 2Determine by how much shop overhead was over- or under-applied during August.
- 2(a)(iii)10 marks· CAPE Accounting Unit 2 · 2010 · Paper 2Compute the cost of the completed jobs (Jobs 811, 813, and 814) for the month.
- 2(a)(iv)4 marks· CAPE Accounting Unit 2 · 2010 · Paper 2Compute the total cost of jobs in process on August 31.
- 2(b)(i)12 marks· CAPE Accounting Unit 2 · 2012 · Paper 2Prepare the job cost sheet for Akupa Engineering Ltd.
- 2(b)(ii)3 marks· CAPE Accounting Unit 2 · 2012 · Paper 2Calculate the quotation price for the job.
- 2(b)8 marks· CAPE Accounting Unit 2 · 2013 · Paper 2State four differences between job order costing and process costing.
- 2(a)10 marks· CAPE Accounting Unit 2 · 2015 · Paper 2Calculate the total cost of EACH job assuming overhead is applied at the rate of $12.50 per machine hour.
- 2(a)(i)4 marks· CAPE Accounting Unit 2 · 2017 · Paper 2Name and describe ONE costing system, other than activity-based costing, which may be used to cost job XYZ.
- 2(b)(i)5 marks· CAPE Accounting Unit 2 · 2018 · Paper 2Calculate the total overhead cost of Job 748.
- 2(b)(ii)7 marks· CAPE Accounting Unit 2 · 2018 · Paper 2Determine the unit cost of Job 748, which consists of 200 units of product.
- 2(a)6 marks· CAPE Accounting Unit 2 · 2021 · Paper 2Explain EACH of the following costing methods, giving ONE example of a type of business that may use each method: • Job-order costing • Process costing
- 2(b)(ii)4 marks· CAPE Accounting Unit 2 · 2021 · Paper 2Calculate the total cost of the ending work-in-process inventory for both February and March.
- 2(c)(i)2 marks· CAPE Accounting Unit 2 · 2021 · Paper 2Calculate the cost per unit of EACH of the following chocolate varieties, using the traditional costing system: • Decadent • Monumental