Quelpr

CAPE Geography Unit 1 · 2014 · Paper 2 · Question 7(d)

Suggest three possible reasons why the critical period of need is between 48 hours and 72 hours after a severe earthquake event.

The mark scheme is shown once you've answered.

Practise this question

Other parts of this question

  1. 7(a)Describe the cycle of waste generated as a result of distribution and consumption of manufactured products as illustrated in Figure 6.[4 marks]
  2. 7(b)With reference to the statement "Global sea level rise is projected to increase the flooding of low-lying areas", describe two causes of global sea level rise.[8 marks]
  3. 7(c)With reference to the five stages outlined in Figure 7, assess the measures taken before and after the occurrence of an earthquake, flood or volcanic eruption…[12 marks]

More practice: the rest of this paper · more Response to Hazards questions · all CAPE Geography Unit 1 past papers