CSEC Integrated Science · May/June 2014 · Paper 2 · Question 1(c)(v)
A large lake/dam was built to control flooding and produce hydroelectric power, replacing diesel-burning power stations.
Identify ONE hazard that can result from these electrical transmission lines.
The mark scheme is shown once you've answered.
Practise this question