Surface Developments and Interpenetration · CSEC Technical Drawing
31 past-paper questions on Surface Developments and Interpenetration, part of Section 2B: Geometrical Construction - Solid Geometry, from every CSEC Technical Drawing paper on Quelpr.
- 5(a)8 marks· CSEC Technical Drawing · May/June 2005 · Paper 2Draw full size the given surface development of the sides of the right square pyramid cut at its lower end as shown in Figure 3.
- 7(a)6 marks· CSEC Technical Drawing · May/June 2005 · Paper 2Draw full size (1:1) the given plan view of the intersecting cylinder and square prism shown in Figure 5.
- 7(b)14 marks· CSEC Technical Drawing · May/June 2005 · Paper 2Draw the complete elevation showing the curve of interpenetration between the square prism and cylinder.
- 5(c)10 marks· CSEC Technical Drawing · May/June 2006 · Paper 2Draw, FULL SIZE, the surface development of the truncated pyramid using S-S as the seam.
- 820 marks· CSEC Technical Drawing · May/June 2006 · Paper 2Draw TWO convolutions of a right-hand helical spring made from a circular steel bar of diameter 10 mm, with outside diameter 70 mm and pitch 50 mm. Show all relevant constructions; hidden details are not required.
- 7(a)12 marks· CSEC Technical Drawing · May/June 2007 · Paper 2Using first-angle orthographic projection, draw the given plan and completed front elevation showing the curves of interpenetration.
- 8(b)14 marks· CSEC Technical Drawing · May/June 2007 · Paper 2Draw the surface development of the cone including the pierced hole, using seam line X-X.
- 5(a)8 marks· CSEC Technical Drawing · May/June 2008 · Paper 2Draw the two given views of the intersecting cylinder and triangular prism shown in Figure 3.
- 5(b)12 marks· CSEC Technical Drawing · May/June 2008 · Paper 2Draw an end view looking in the direction of arrow 'E', showing the curve of interpenetration and all hidden detail lines.
- 6(a)8 marks· CSEC Technical Drawing · May/June 2008 · Paper 2Draw full size the given surface development and incomplete elevation of the cone with triangle ABC lying on its surface as shown in Figure 4.
- 6(b)12 marks· CSEC Technical Drawing · May/June 2008 · Paper 2Complete the elevation to show triangle ABC lying on the surface of the cone, showing all hidden details and construction lines clearly.
- 6(b)10 marks· CSEC Technical Drawing · May/June 2009 · Paper 2Draw the surface development of the truncated pyramid with the seam as indicated.
- 820 marks· CSEC Technical Drawing · May/June 2009 · Paper 2Draw one complete turn of a right-hand helical circular cross-section spring, having a pitch of 120 mm, centre line diameter of 116 mm, and wire diameter of 16 mm.
- 6(b)14 marks· CSEC Technical Drawing · May/June 2010 · Paper 2Draw full size the development of the truncated right rectangular prism using C₁C₁ as the seam.
- 7(b)8 marks· CSEC Technical Drawing · May/June 2010 · Paper 2Complete the elevation showing the curve of interpenetration between the hexagonal prism and the cylinder.
- 7(c)6 marks· CSEC Technical Drawing · May/June 2010 · Paper 2Complete the plan showing the curve for the end of the cylinder.
- 6(c)10 marks· CSEC Technical Drawing · May/June 2011 · Paper 2Draw the surface development of the truncated pyramid opened along seam S-S.
- 7(b)(i)10 marks· CSEC Technical Drawing · May/June 2011 · Paper 2Complete the elevation by constructing the curves of interpenetration between both cylinders, showing hidden lines.
- 7(c)8 marks· CSEC Technical Drawing · May/June 2012 · Paper 2Draw the surface development of the pyramid with a-a representing the seam.
- 8(b)8 marks· CSEC Technical Drawing · May/June 2012 · Paper 2Starting at P on the given elevation, draw ONE turn of a single line helix of the cylinder with a pitch of 60 mm in the direction shown.
- 5(a)8 marks· CSEC Technical Drawing · May/June 2013 · Paper 2Construct the given plan.
- 5(b)12 marks· CSEC Technical Drawing · May/June 2013 · Paper 2Complete the elevation showing the line of interpenetration between the cylinder and hexagonal prism.
- 7(b)14 marks· CSEC Technical Drawing · May/June 2013 · Paper 2Construct the surface development of the truncated cylinder, using the indicated seam position.
- 5(a)8 marks· CSEC Technical Drawing · May/June 2014 · Paper 2Construct the given end elevation.
- 5(b)12 marks· CSEC Technical Drawing · May/June 2014 · Paper 2Construct the front elevation showing the curves of interpenetration and hidden details.
- 6(a)6 marks· CSEC Technical Drawing · May/June 2014 · Paper 2Copy the given view of the intersecting pipes.
- 6(b)14 marks· CSEC Technical Drawing · May/June 2014 · Paper 2Construct the surface development of pipe A using the seam as shown on the view.
- 6(b)12 marks· CSEC Technical Drawing · May/June 2015 · Paper 2Complete the given views showing the lines of intersection.
- 8(b)10 marks· CSEC Technical Drawing · May/June 2015 · Paper 2Draw the development of the truncated cone using 'S-S' as the seam.
- 5(b)14 marks· CSEC Technical Drawing · May/June 2016 · Paper 2Draw the surface development of the prism, opening along seam X–X.
- 6(b)14 marks· CSEC Technical Drawing · May/June 2016 · Paper 2Construct a right-hand helix on the circumference of the cylinder starting from point P, showing hidden detail.